Unfortunately the wet weather forecast was entirely accurate and it drizzled all morning but we had, had materials delivered to the site and I wanted to get the job done.
Before! |
Better equipped, the loose soil was scraped out and a membrane put down.
A layer of hard-core went on top of the membrane followed by type one hoggin and stones to finish.
After! |
Meanwhile, at the top, we attempted to improve the rather sticky path left by last month's pipe installation. The surface was prepared and compost from the woodland heap added to the soil.
Excavating the compost heap. |
Sowing the seed. |
Treading it in. |
A small team today but we got the job done. Thanks to Richard and Glenn for the planning, organising of materials and on site assistance.