Unfortunately the wet weather forecast was entirely accurate and it drizzled all morning but we had, had materials delivered to the site and I wanted to get the job done.
![]() |
Before! |
Better equipped, the loose soil was scraped out and a membrane put down.
A layer of hard-core went on top of the membrane followed by type one hoggin and stones to finish.
![]() |
After! |
Meanwhile, at the top, we attempted to improve the rather sticky path left by last month's pipe installation. The surface was prepared and compost from the woodland heap added to the soil.
![]() |
Excavating the compost heap. |
![]() |
Sowing the seed. |
![]() |
Treading it in. |
A small team today but we got the job done. Thanks to Richard and Glenn for the planning, organising of materials and on site assistance.