Sunday, 3 March 2019

Sunday 3rd March 2019 - Work Party

The entrance to the woodland had become a bit of a mess, falling foul of the poor reversing skills of the driver of the bin lorry and being their lunch spot, mid round on a Tuesday. It became our priority for this month's work party to improve this entrance and therefore access to the wood.

Unfortunately the wet weather forecast was entirely accurate and it drizzled all morning but we had, had materials delivered to the site and I wanted to get the job done.
Before!
Once on site we realised that digging out the mud by hand would be a massive job and we needed mechanical assistance. Fortunately one of the team is the local farmer so off he went.



Better equipped, the loose soil was scraped out and a membrane put down.



A layer of hard-core went on top of the membrane followed by type one hoggin and stones to finish.


After!

Meanwhile, at the top, we attempted to improve the rather sticky path left by last month's pipe installation. The surface was prepared and compost from the woodland heap added to the soil.
Excavating the compost heap.
 Grass and clover seed was scattered on the path and trodden in. It then got a good watering!
Sowing the seed.

Treading it in.


 This time last year, the woodland was knee deep in snow. This year, there are sweet violets, primroses and wild daffodils in flower.




A small team today but we got the job done. Thanks to Richard and Glenn for the planning, organising of materials and on site assistance.


Tuesday, 5 February 2019

Looking back




Looking back 5 years to a visit from Suffolk Traditional Orchard Group, STOG, and the planting of the new fruit trees. 

Sunday 3rd February 2019 - Work Party


A cold but sunny morning and a bit of a project in the woodland this month. We have been planning for sometime to increase the habitat diversity by having some water in the woodland. It would have been ideal to have a pond but this wasn't possible because of health and safety, and therefore, insurance issues with creating  a new pond.
Fortunately, there is an existing boundary ditch, which flows in the winter, and the
remains of a channel down the centre. The plan was to divert some of the water from the ditch into this channel, and here is how we got on.


 
First a trench was dug to connect the 2 ditches. We found lots of sticky Suffolk clay and the water started running straight away!




The pipes were laid alongside the trench and joined together, with a bit of a wiggle and a bit of brute force, and placed on struts over the trench. 



Once it was all joined together, the pipe was put in the bottom of the trench. After coffee it was filled back in and here we have it water flowing through the woodland.
The next day it rained and the you can just make out the pool it formed downhill. Not dug out by us! Unfortunately this has now overflowed and made rather a boggy area at the bottom of the woodland so some refinement will be necessary! The path at the top will also be redefined and seeded.

Many thanks to Holmes plant hire for lending the mini digger and Glenn for driving it so expertly.

While all this was going on, other team members were putting the tree guards on the den sallows and generally getting on with proper woodland maintenance.








Saturday, 12 January 2019

Sunday 6th January 2019 - Work Party

Happy new year from the Framsden Woodland Group! The year has started as the old one finished, a bit grey and drizzly.
I also forgot to take any photos until the end so there are not many action shots this month.

 The aim is to have an area of productive coppice in the woodland. This means cutting the hazels to the ground so that they grow up again with lots of stems. This is done on a cycle and let's light to the ground, important for wild flowers, and hopefully produces coppice products such as pea sticks. With this on mind we coppiced a couple of stools in the glade area.

It was only when walking round at the end that I saw the damage on the sallow planted last month so I think that these and the coppice will need some protection.

Several ash at the top end were showing dieback, a sign of chalara, and were felled using hand saws.



The fruit bushes were mulched and the apples given a light formative prune.


The ditch was given it's annual clear out, although it is dry at the moment.

Snowdrops are just poking through.


The fire pit was lit just to cheer up the day but it was lovely to stand around with hot soup and warm the bread rolls on for refreshments.

Many thanks everyone again.

Friday, 7 December 2018

Sunday 2nd December 2018 - Work Party


In spite of the poor weather forecast, we went ahead with the work party and were rewarded with unseasonably warm weather and even a bit of sunshine. Some of the team were at the village playground cutting back overhanging branches and the rest of us were in the woodland.

There was the last round of leaf raking, and blowing, on the paths, the sallow was coppiced and the sticks stuck in to thicken up the den structure. Hopefully they will grow!
The old ash poles were taken out of the den and sawn up to replenish the wood store. We also chopped up some logs to fill up the kindling box.


The fire was lit and I attempted to make popcorn but it needs refining a bit, we will try again with a longer chain and heavier bottomed pan.
The fire did come in handy for warming the scones at refreshment time though. Thanks Erin for a lovely spread!



Monday, 5 November 2018

Pumpkin lantern trail 31st October 2018


Fortunately we picked a dry day in the middle of a wet week. Lots of fun and pumpkins as usual.

The woodland group provided hot punch, hot chocolate to drink and marshmallows and sausages to toast on the fire pit




Ian's pumpkin - photo credit Brian










Many thanks to Steve for the use of his photos too.